Prisma System Projects

  • PROJECT: 103 MWp solar energy production of photovoltaic systems;
  • Location: Turkey;
  • Required Investment: 85% debt and 15% equity.

YEAR: 2016 and ongoing


  • PROJECT: 20 MWp solar energy ground-based photovoltaic system;
  • Location: Puerto Rico;
  • Required Investment:  € 1.780/kWp turn key, with all rights and  permits.

YEAR: 2016 and ongoing


  • PROJECT: 200 MWp solar energy joint venture;
  • Location: Mexico;
  • Required Investment: $60, 391, 261.00 : 20% equity, 15% mezzanine, 65% debt.

YEAR: 2016 and ongoing


  • PROJECT: 50 MWp ground-based photovoltaic system;
  • Location: Poland;
  • Required Investment: €1,250/ kWp turn key with all permits and rights.

YEAR: 2016 and ongoing


  • PROJECT: 20 MWp ground-based photovoltaic system
  • Location: Poland
  • Required Invesment: €1,250/ kWp turn key with all permits and rights.

YEAR: 2016 and ongoing


  • PROJECT: 50 MWp ground-based photovoltaic system;
  • Location: Lahore, Punjab, Pakistan;
  • Required Invesment: €1,340/ kWp turn key with all permits and rights.

YEAR: 2016 and ongoing


  • PROJECT: 50 MWp ground-based photovoltaic system;
  • Location: Peshawar, Pakistan;
  • Required Investment:  €1,500/ kWp turn key with all permits and rights.

YEAR: 2016 and ongoing


  • PROJECT: 8 MWp ground-based photovoltaic system;
  • Location: Koray, Turkey;
  • Required Investment: €1,210/ kWp turn key with all permits and rights.

YEAR: 2016 and ongoing


  • PROJECT: 100 MWp ground-based photovoltaic system;
  • Location: Karachi, Pakistan
  • Required Investment: €1,500/ kWp turn key with all permits and rights

YEAR: 2016 and ongoing


  • PROJECT: Production line for solar modules;
  • Location: Recife, Brazil;
  • Required Investment :USD $ 37,500,000 with a financing arrangement of   100% financing or 80%/20%

YEAR: 2016 and ongoing


  • PROJECT: Construction of two warehouses;
  • Location: Port of Recife, Brazil;
  • Required Investment: USD $8, 280,000.

YEAR: 2016 and ongoing


  • PROJECT: 90 MWp ground-based photovoltaic system;
  • Location: Poland;
  • Required Investment: €1,250/ kWp turn key with all permits and rights

YEAR: 2015 and ongoing


  • PROJECT: 100 MWp ground-based photovoltaic system;
  • Location: Poland;
  • Required Investment: €1,250/ kWp turn key with all permits and rights

YEAR: 2015 and ongoing


  • PROJECT: 115 MWp ground-based photovoltaic system;
  • Location: Poland;
  • Required Investment: €1.250/ kWp turn key with all permits and rights)

YEAR: 2015 and ongoing


  • PROJECT: 120 MWp ground-based photovoltaic system;
  • Location: Poland;
  • Required Investment: €1.25/ kWp turn key with all permits and rights

YEAR: 2015 and ongoing


  • PROJECT: 50,000 kW ground-based photovoltaic system;
  • Location: Dominican Republic;
  • Required Investment: € 1.55/kWp turn key with all permits and rights.

YEAR: 2015 and ongoing


  • PROJECT: P55,000 kW ground-based photovoltaic system;
  • Location: Honduras;
  • € 1.450 p/kWh turn key with all permits and rights.

YEAR: 2015 and ongoing


  • PROJECT: 100,000 kW ground-based photovoltaic system;
  • Location: Kazakhstan;
  • Required Investment: € 1.350 p/kWh turn key with all permits and rights.

YEAR: 2015 and ongoing


  • PROJECT: 100,000 kW ground-based photovoltaic system;
  • Location: Schlesien;
  • Required Investment: € 1.05 p/kWh turn key with all permits and rights.

YEAR: 2015 and ongoing